The properties and coating procedure shall conform to project specifications. If necessary, openings shall be provided in the formwork for the removal of the foreign materials.īefore placing the formwork, it will be coated with the approved release agent. Prior to concreting, the form shall be cleaned and any foreign material shall be removed. Through-ties shall be used for big area forms. Forms for small section elements, i.e, columns, shall be tied externally. Ties will be placed at such intervals that will not allow any movement or deformation of the formwork beyond the specified tolerance limits.


The timber formwork is to be used when limited reuse of formwork is required.